Title: | An Innovative Solution to Reduce a time of Develo-ping of the Mine Excava-tion’s Technological Parts |
Authors: | Shkumatov, Alexander Moroz, Oleg Ivanchishin, Dmitry Proskurin, Aleksiy Мороз, Олег Кузьмич |
Keywords: | coal mine excavation develop mine excavation |
Issue Date: | 2013 |
Publisher: | Budownictwo Gornicze i Tunelowe” Kwartalnik naukowotechniczny, 2013, №3. Wydawnictwo Gornicze.Sp. z o.o., Katowice, Poland,58 str. |
Abstract: | In coal mines of Ukraine per 1 km of mine excavations that aie being constructed, it is necessary to prepare up to 7 mines' connections. This requires the construction of the same number of technological parts. They are no long, but need from 1 up to 3 months to be created or 10% of general developing period. |
Description: | In coal mines of Ukraine per 1 km of mine excavations that aie being constructed, it is necessary to prepare up to 7 mines' connections. This requires the construction of the same number of technological parts. They are no long, but need from 1 up to 3 months to be created or 10% of general developing period. |
URI: | http://ea.donntu.edu.ua/handle/123456789/27438 |
ISSN: | 1234-5342 |
Appears in Collections: | Наукові публікації кафедри РРКК |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Shkumatov_Moroz_13.pdf | 415,17 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.