Please use this identifier to cite or link to this item: https://ea.donntu.edu.ua/jspui/handle/123456789/27438
Title: An Innovative Solution to Reduce a time of Develo-ping of the Mine Excava-tion’s Technological Parts
Authors: Shkumatov, Alexander
Moroz, Oleg
Ivanchishin, Dmitry
Proskurin, Aleksiy
Мороз, Олег Кузьмич
Keywords: coal mine
excavation
develop
mine excavation
Issue Date: 2013
Publisher: Budownictwo Gornicze i Tunelowe” Kwartalnik naukowotechniczny, 2013, №3. Wydawnictwo Gornicze.Sp. z o.o., Katowice, Poland,58 str.
Abstract: In coal mines of Ukraine per 1 km of mine excavations that aie being constructed, it is necessary to prepare up to 7 mines' connections. This requires the construction of the same number of technological parts. They are no long, but need from 1 up to 3 months to be created or 10% of general developing period.
Description: In coal mines of Ukraine per 1 km of mine excavations that aie being constructed, it is necessary to prepare up to 7 mines' connections. This requires the construction of the same number of technological parts. They are no long, but need from 1 up to 3 months to be created or 10% of general developing period.
URI: http://ea.donntu.edu.ua/handle/123456789/27438
ISSN: 1234-5342
Appears in Collections:Наукові публікації кафедри РРКК

Files in This Item:
File Description SizeFormat 
Shkumatov_Moroz_13.pdf415,17 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.